it’s essential to take careful safety precautions, such as wearing protective gear, testing in properly ventilated areas, only using hoses that have passed a service test within the past 12 months, and shutting down discharges before changing nozzles. Test results should not deviate by more than five percent from the initial acceptance test performed right after the fire pump was installed or the pressures indicated on its nameplate. If that information isn’t available, a satisfactory test should deliver: 150 percent of rated capacity at 65 percent of rated pressure 100 percent of rated capacity at rated pressure A maximum of 140 percent of rated pressure at churn (no flow) Let’s dig into what that means: Fire pumps are designed to produce specific flow rates and pressures. Minimum, rated, and peak loads refer to the amount of water flow that the pump will allow. Rated capacity occurs when the pump is discharging water at its specified pressure. The churn pressure is a measure of the pressure the pump delivers when it is running without water flowing through it. The more water that’s flowing, the more work the pump is performing, and the less pressure that’s available. A well-performing pump must produce not less than 65 percent of rated pressure when flowing water at a rate of 150 percent of rated flow. While NFPA 20 should be consulted for more details about fire pump flow testing, read on for an 5 of 25 ! 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… overview of what’s required by NFPA 25: From the 2017 edition of NFPA 25 8.3.3* Annual Flow Testing. 8.3.3.1* An annual test of each pump assembly shall be conducted by qualified personnel under no-flow (churn), rated flow, and 150 percent of the pump rated capacity flow of the fire pump by controlling the quantity of water discharged through approved test devices. 8.3.3.1.1 If available suction supplies do not allow flowing of 150 percent of the rated pump capacity, the fire pump shall be tested to the maximum allowable discharge. Watch this video for step-by-step instructions for performing an annual fire pump flow test: FIRE PUMP How to perform annual Fire pump test. Acceptable configurations for fire pump flow tests Flow tests are usually performed by attaching hoses to the pump’s discharge test header and running them to a safe location where flowing water won’t cause damage. Flowing water exerts significant force, so make sure the hoses are laid out neatly and securely anchored 6 of 25 ! 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… to ensure safe operation. Under no circumstances should anyone— even a trained firefighter—hold any hose during a flow test. T-shaped hose monsters that counteract the force of the water are safer to use during testing than hose nozzles, which can come loose. Attaching the hoses to playpipes securely anchored to a truck or trailer is another option. Playpipes are remarkably smooth, long pipes with a nozzle at the end that straighten streams of water while reducing turbulence. Playpipes attached directly to the pump test header may also allow for safe water discharge, as long as there is a clear path for water streams and ground run-off that won’t damage landscaping or equipment. No matter what discharge method you choose, water streams or inadequate drainage can damage the discharge area. Many jurisdictions have specific requirements for the disposal of test water; it’s essential to find out what they are and follow them. ! 7 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… From the 2017 edition of NFPA 25 8.3.3.6 The annual test shall be conducted as follows: (1) The arrangement described in 8.3.3.6.1 or 8.3.3.6.2 shall be used at a minimum of every third year. (2)* The arrangement described in 8.3.3.6.3 shall be permitted to be used two out of every three years. 8.3.3.6.1 Use of Pump Discharge via Hose Streams. 8.3.3.6.1.1 Pump suction and discharge pressures and the flow measurements of each hose stream shall determine the total pump output. 8.3.3.6.1.2* Care shall be taken to minimize any water damage caused by the high volume of water discharging during the test. 8.3.3.6.2 Use of Pump Discharge via Bypass Flowmeter to Drain or Suction Reservoir. Pump suction and discharge pressures and the flowmeter measurements shall determine the total pump output. A flow loop is a piping configuration that enables fire pump testing without flowing water out of the sprinkler system. Instead, it’s sent through a flow meter, returned to the suction side of the fire pump, and cycled back through the system. Flowmeter devices make it possible to perform the annual flow test without flowing large amounts of water by measuring the amount of water flow in a recirculating system. ! 8 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… Source: Talco Fire Systems There are some drawbacks to this testing method. For one, it doesn’t test whether the water available from the suction supply meets the requirements of NFPA 25, section 8.1.6: 8.1.6 Energy Source. The energy sources for the pump driver shall supply the necessary brake horsepower of the driver so that the pump meets system demand. Another risk is that the flow meter can go out of calibration. That said, flow loops also don’t waste water, which can be a major benefit for high-capacity pumps where water waste can quickly reach thousands of gallons and transform discharge sites into swimming pools. When flow loops are used, they are typically paired with test headers to ensure proper calibration of the flow meter. ! 9 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… 8.3.3.6.3 Use of Pump Discharge via Bypass Flowmeter to Pump Suction (Closed-Loop Metering). 8.3.3.6.3.1 Pump suction and discharge pressures and the flowmeter measurements shall determine the total pump output. 8.3.3.6.3.2 When testing includes recirculating water back to the fire pump suction, the temperature of the recirculating water shall be monitored to verify that it remains below temperatures that could result in equipment damage as defined by the pump and engine manufacturers. 8.3.3.6.3.3 If the test results are not consistent with the previous annual test, the test shall be repeated using the test arrangement described in 8.3.3.6.3.1. 8.3.3.6.3.4 If testing in accordance with 8.3.3.6.3.1 is not possible, a flowmeter calibration shall be performed and the test shall be repeated. A transducer on a fire pump controller. Source: tornatech Highly accurate equipment is essential for annual fire pump flow test ! 10 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… High-quality test equipment is essential for fire pump annual flow tests. For best results, everything that’s used should bear a calibration sticker attesting to calibration within the past year by an approved calibration facility. If possible, the calibration certificate should also be available for inspection. The gauges and transducers—a device that converts energy into an electrical signal—used during the flow test must be unique to the test because they need to be incredibly accurate. Their measurements need to be within +/- 1 percent to accurately identify trends over time. The standard gauges on the fire pump can’t be used during the test because they aren’t precise enough. Equipment other than pressure gauges, such as tachometers and ammeters, should be calibrated to the manufacturer’s specifications. Readings from equipment with this level of accuracy and calibration can be used without adjustment. To avoid costly delays, it’s wise to have a spare set of equipment available during the test in case any piece of test equipment fails. ! 11 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… From the 2017 edition of NFPA 25 8.3.3.2 Test Equipment. 8.3.3.2.1 Voltage and amperage readings on fire pump controllers that meet the following criteria shall be permitted in lieu of calibrated voltage and/or amperage meters: (1) The fire pump controller shall have been factory calibrated and adjusted to ±3 percent. (2) The voltage reading shall be within 5 percent of the rated voltage. 8.3.3.2.2 Except as permitted in 8.3.3.2.1, calibrated test equipment shall be provided to determine net pump pressures, rate of flow through the pump, volts and ampere, and speed. 8.3.3.2.2.1 Calibrated gauges, transducers, and other devices used for measurement during the test shall be used and bear a label with the latest date of calibration. 8.3.3.2.2.2 Gauges, transducers, and other devices, with the exception of flow meters, used for measurement during the test shall be calibrated a minimum of annually to an accuracy level of ±1 percent. 8.3.3.2.2.3 Flow meters shall be calibrated annually to an accuracy level of ±3 percent. 8.3.3.3 Discharge and sensing orifices that can be visually observed without disassembling equipment, piping, or valves shall be visually inspected and be free of damage and obstructions that could affect the accuracy of the measurement. 8.3.3.4 The sensing/measuring elements in a flow meter shall be calibrated in accordance with 8.3.3.2. 8.3.3.5 Discharge orifices shall be listed or constructed to a recognized standard with a known discharge coefficient. Requirements for performing the annual flow test Pressure readings During a flow test, pressure readings are taken as the pump is run ! 12 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… through various stages, plotted on hydraulic graph paper, and compared to factory specifications and test results from previous years. Certain digital ITM platforms can plot this information within readymade software and automatically generate reports. If there is a significant reduction in the pump’s rated performance compared to what’s shown on the fire pump nameplate or original acceptance test curve, an investigation is needed to determine necessary corrections and repairs. From the 2017 edition of NFPA 25 8.3.3.7 The pertinent visual observations, measurements, and adjustments specified in the following checklists shall be conducted annually while the pump is running and flowing water under the specified output condition: (1) At no-flow condition (churn), the procedure is as follows: (a) Inspect the circulation relief valve for operation to discharge water. (b) Inspect the pressure relief valve (if installed) for proper operation. (2) At each flow condition, the procedure is as follows: (a) Record the electric motor voltage and current (all lines). (b) Record the pump speed in rpm. (c) Record the simultaneous (approximately) readings of pump suction and discharge pressures and pump discharge flow. (3)* For electric motor–driven pumps, do not shut down the pump until it has run for 10 minutes. (4) For diesel motor–driven pumps, do not shut down the pump until it has run for 30 minutes. ! 13 of 25 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… Opened pressure relief valves can impact fire pump flow tests by discharging water not measured by the recording device. How to handle pressure relief valves A pressure relief valve is a safety device designed to discharge a large flow of water when the pressure in a system exceeds prescribed limits. However, an opened pressure relief valve will impact flow test results by discharging water that’s not measured by the recording device during the test. It may become necessary to temporarily close the pressure relief valve to achieve satisfactory fire pump test results. At the end of the flow test, the pressure relief valve can be readjusted to relieve pressure that’s greater than the normal operating pressure of the system. If the valve is opened during flowing conditions because the pressure is too high for the fire pump’s components, the discharge control valve should be closed before closing the pressure relief valve to protect the 14 of 25 ! 1/23/21, 6:04 AM The Fire Pump Flow Test: NFPA 25 Annual Fire Pump Tests https://www.qrfs.com/blog/245-the-fire-pump-flow-test-nfpa-25-requ… system from damage due to an overpressure event. The discharge valve can be re-opened after the test. From the 2017 edition of NFPA 25 8.3.3.8* For installations having a pressure relief valve, the operation of the relief valve shall be closely observed during each flow condition to determine whether the pump discharge pressure exceeds the normal operating pressure of the system components. 8.3.3.8.1* The pressure relief valve shall also be observed during each flow condition to determine whether the pressure relief valve closes at the proper pressure. 8.3.3.8.2 The pressure relief valve shall be closed during flow conditions if necessary to achieve minimum rated characteristics for the pump and reset to normal position at the conclusion of the pump test. 8.3.3.8.2.1 When it is necessary to close the relief valve to achieve minimum rated characteristics for the pump, the pump discharge control valve shall be closed if the pump churn pressure exceeds the system rated pressure. 8.3.3.8.3 When pressure relief valves are piped back to the fire pump suction, the temperature of the recir…Do you similar assignment and would want someone to complete it for you? Click on the ORDER NOW option to get instant services at essayloop.com

Do you have a similar assignment and would want someone to complete it for you? Click on the ORDER NOW option to get instant services at essayloop.com. We assure you of a well written and plagiarism free papers delivered within your specified deadline.